SUS316 Stainless Steel Press Male Fittings Tee For Pipeline Connection

Kratki opis:

1. Refusing water leakage
2. Economical and practial
3. Easy to install
4. Energy saving
5. Anti-rust
6. Healthy to human

Detalji o proizvodu

oznake proizvoda

1. Refusing water leakage
2. Economical and practial
3. Easy to install
4. Energy saving
5. Anti-rust
6. Healthy to human

 

proizvod Parametri

Product name  

SUS316 Stainless Steel Press Male Fittings Tee for Pipeline Connection

materijal TP304(SS304), TP316(SS316), TP316L(SS316L)
pakovanje In wooden cases with water-proof package or as customers’ requirement for stainless steel tee packing
Documents 1, Raw material certification
2, All the test & Inspection reports
3, Quality warranty letter
Min order 10 pieces
Productivity 20000 Pieces per month
Deliverytime 10days-25days
Payment terms T/T L/C
usluga OEM , besplatan uzorak, Third Party Test for Stainless Steel Tee

 

CHEMICAL COMPOSITION(%)
MATERIAL C i Mn P S Ni Cr others
304/1.4301 ≤0.08 ≤1.00 ≤2.00 ≤0.045 ≤0.03 8.00-10.50 18.00-20.00
304L/1.4306 ≤0.03 ≤1.00 ≤2.00 ≤0.045 ≤0.03 8.00-12.00 18.00-20.00
316/1.4401 ≤0.08 ≤1.00 ≤2.00 ≤0.045 ≤0.03 10.00-14.00 16.00-18.00
316L/1.4404 ≤0.03 ≤1.00 ≤2.00 ≤0.045 ≤0.03 10.00-14.00 16.00-18.00
201(≥1.0%Ni) ≤0.12 ≤1.00 8.5-10.0 ≤0.06 ≤0.03 ≥1.00 14.00-16.00
201(<1.0% Ni) ≤0.15 ≤1.00 8.5-10.0 ≤0.06 ≤0.03 <1.00 14.00-16.00
430/1.4016 ≤0.12 ≤1.00 ≤1.00 ≤0.040 ≤0.03 ≤0.75 16.00-18.00
409 ≤0.08 ≤1.00 ≤1.00 ≤0.040 ≤0.03 ≤0.50 10.50-11.75
409L ≤0.03 ≤1.00 ≤1.00 ≤0.040 ≤0.03 ≤0.50 10.50-11.75
410/1.4006 ≤0.15 ≤1.00 ≤1.00 ≤0.040 ≤0.03 ≤0.50 12.00-14.00

Specification

Tee with female threadead
Dimensions L L1 Z Z1 S
15 x 1/2x 15 82 34 19 19 26
18 x 1/2x 18 82 37 19 22 26
18 x 3/4x 18 82 39 19 23 30
22 x 1/2x 22 88 39 21 24 26
22 x 3/4x 22 88 40 21 24 30
28 x 1/2x 28 96 41 24 26 26
28 x 3/4x 28 96 43 24 27 30
28 x 1x 28 88 47 24 28 38
35 x 1/2x 35 110 44 27 29 26
35 x 3/4x 35 110 46 27 28 30
35 x 1 1/4″ x 35 110 54 27 33 47
42 x 1/2x 42 134 48 31 33 26
42 x 3/4x 42 134 50 31 34 30
42 x 1 1/2″ x 42 134 59 31 38 55
54 x 1/2x 54 154 54 36 39 26
54 x 3/4x 54 154 56 36 40 30
54 x 2x 54 154 70 36 44 70

 

Equal Tee
Dimensions L Z L1 Z1
15 82 19 36 14
18 82 19 39 17
22 88 21 42 19
28 96 24 46 22
35 110 27 53 25
42 134 31 66 30
54 154 36 77 36

 

Reducing Tee
Dimensions L Z L1 Z1
18 x 15 x 18 82 19 39 17
22 x 15 x 22 88 21 41 19
22 x 18 x 22 88 21 41 19
28 x 15 x 28 96 24 54 32
28 x 18 x 28 96 24 54 32
28 x 22 x 28 96 24 44 21
35 x 15 x 35 108 27 57 35
35 x 18 x 35 108 27 57 35
35 x 22 x 35 108 27 48 25
35 x 28 x 35 108 27 49 25
42 x 22 x 42 134 30 51 28
42 x 28 x 42 134 30 52 28
42 x 35 x 42 134 30 55 28
54 x 22 x 54 154 36 57 34
54 x 28 x 54 154 36 58 34
54 x 35 x 54 154 36 61 34
54 x 42 x 54 154 36 73 36

 

Applications
School, residential area, hotel, shopping mall, pumping room, natural gas, solar energy, central air conditioning.

Why Choose Us?

1. Approved by ISO9001, CE, SGS every year

2. Best service within 24 hour`s reply

3. Flexible payment with T/T,L/C and etc

4. Smooth production ability (50000 PCS/month)

 

What Can We Serve For You?

1. Sample can be offered with free.

2. We have full stock,and can deliver within short time.Many styles for your choices.

3. OEM and ODM order are accepted, Any kind of logo printing or design are available.

4. Dobra kvaliteta + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.

5. All of our products are produce by our professional workman and we have our high-work-effect foreign trade team, you can totally believe our service.

 

Engineering Case
Singapore Financial CenterLiuzhou People’s HospitalCrowne Plaza Poly HotelShenzhen Songgang Middle SchoolBeijing Daxing Airport

Installation

Step 1: Pipes are preferably cut perpendicularly to length with a pipe cutter or fine-tooth saw or a special electrical pipe saw.

Step 2: The pipes are then to be carefully deburred inside and out and, if necessary, calibrated.

Step 3: The press fittings should be inspected visually for integrity prior to processing. In addition, the O-ring must be checked for correct fit and integrity. No other lubricants such as oils or greases may be used and only original IBP sealing elements are to be used.

Step 4: Before assembly, the insertion depth of the fitting must be marked on the pipe (for the dimensions, see the table later). Thus, any shifts can be detected before pressing.

Step 5: The pipe is inserted into the fitting as far as the pipe stop in accordance with the previously applied insertion mark.

Step 6: Insert the appropriate size of press jaw in the crimping tool and position the jaw at right-angles on the fitting at the pressing location. The press cycle is started by starting the pressing machine and is completed when the jaws are fully closed. Caution! Secure pressings can be achieved only when the pressing jaws have moved completely together.

Related Products

Naša kompanija

Foshan Kuanyu nehrđajućeg čelika Co., Ltd, osnovan u 2011, je moderno preduzeće, specijalizirana za proizvodnju i veleprodaju za sve materijale od nehrđajućeg čelika cijevi za vodu za piće,od nehrđajućeg čelika zavarenih cijevi, od inoxa cijevi i tako dalje. Naši proizvodi zadovoljavaju standard ASTM, EN, IT, DIN itd, i široko koriste u naftnoj industriji nafte, petrokemijske, elektricitet, papir odluka, vina i automobilske industrije, mehaničke strukture, izgradnja, elektronski biološke tehnologije, okoliša inženjering i kuhinja proizvoda. Mi smo prošli ISO9001 i ISO14001.

Kako bi se proizvodi najbolje proizvode, koristimo najnapredniji mašine, inovativna tehnologija proizvodnje, konkurentniji proizvodne linije, kao i sa stručnog osoblja, bogato iskustvo, da "Kuanyu cijevi od nehrđajućeg čelika" postati model naše industrije.

Naša radionica

Naš poslovni partner

pakovanje
Wooden case with water-proof bag or as your requirement for stainless steel press tee packing.

FAQ

Q: Koja je vaša MOQ(minimalna količina narudžbe)?
A: Usually our MOQ is 50 pcs, ali ne možemo prihvatiti manje količine za suđenje kako. Pls slobodno nam reći koliko komad trebate.

Q: Jeste li proizvođač ili trgovac?
A: Mi smo u fabrici manufacturer.Our registar se nalazi u glavnom od nehrđajućeg čelika proizvodne baze u Kini-Foshan City koji je u blizini Guangzhou / Shenzhen luke.

Q:Kako bi bilo da vaše sposobnosti dizajn? Nudite OEM usluga?
A: mi imamo svoje odjel dizajna, i imaju ponuda dizajn servis za hiljade kooperativnog partnera. OEM prihvatiti i ponuda poverljivosti “poslovnu tajnu ugovor” za svoj dizajn sigurno.

Q: Koja je vaša rokove plaćanja?
A: 30% unaprijed T / T ,70% bit će prije isporuke ili protiv BL kopirati pod FOB / CIF / CFR.

Q: Koliko dugo je vremena vremena proizvodnje olova ?
A: TO JE 10-15 dana uglavnom i može se po dogovoru na osnovu vaših potreba i količine.

Pošaljite poruku za nas:

UPIT SADA
UPIT SADA