316L Stainless Steel V Profile Press Fittings 90 Degree Elbow

kurze Beschreibung:

Kuanyu focus on the production of 304, 316L thin-walled stainless steel pipe and press fittings. For it is high corrosion resistance and strengthreliable and durablelong-life servicesafety and health to humaneco-friendlyextreme simplicity and quickness of installation, the stainless steel press fittings are widly applied to hospitals, schools, communities, hotels drinking water pipeline system.

Produktdetail

Produkt Tags

Kuanyu focus on the production of 304, 316L thin-walled stainless steel pipe and press fittings. For it is high corrosion resistance and strengthreliable and durablelong-life servicesafety and health to humaneco-friendlyextreme simplicity and quickness of installation, the stainless steel press fittings are widly applied to hospitals, schools, communities, hotels drinking water pipeline system.

 

Produktparameter

Products name 316L Stainless Steel V Profile Press Fittings 90 Degree Elbow
Steel Grade: 300 series SUS304 316 316L
Größe: 15-108Millimeter
Art: Equal elbow, reducing elbow, female elbow, 45 degree elbow, 90 degree elbow etc.
Max working pressure: 1.6MPa (equal to 232 psi)
Testing water pressure: 2.5MPa for JIS sizes (equal to 362.5psi), and 5MPa for EN10312 sizes.
Working temperature -20 zu 110 degree centigrade (with Chlorinated butyl rubber O ring),
Suit medium: Cold water, hot water, compressed air, gas, oil etc
Price Term: FOB, CIF, CFR or as your requirement
Payment: T / T. 30% in advance, the balance before shipment
Delivery: About 15 Tage nach Erhalt der Anzahlung
Verpackung: Wooden case water-proof package or as your requirement for stainless steel elbow packing

 

CHEMICAL COMPOSITION(%)
MATERIAL C. Und Mn P. S Ni Cr others
304/1.4301 ≤ 0,08 ≤ 1,00 ≤ 2,00 ≤ 0,045 ≤0.03 8.00-10.50 18.00-20.00
304L/1.4306 ≤0.03 ≤ 1,00 ≤ 2,00 ≤ 0,045 ≤0.03 8.00-12.00 18.00-20.00
316/1.4401 ≤ 0,08 ≤ 1,00 ≤ 2,00 ≤ 0,045 ≤0.03 10.00-14.00 16.00-18.00
316L/1.4404 ≤0.03 ≤ 1,00 ≤ 2,00 ≤ 0,045 ≤0.03 10.00-14.00 16.00-18.00
201(≥1.0%Ni) ≤0.12 ≤ 1,00 8.5-10.0 ≤0.06 ≤0.03 ≥1.00 14.00-16.00
201(<1.0% Ni) ≤0.15 ≤ 1,00 8.5-10.0 ≤0.06 ≤0.03 <1.00 14.00-16.00
430/1.4016 ≤0.12 ≤ 1,00 ≤ 1,00 ≤ 0,040 ≤0.03 ≤0.75 16.00-18.00
409 ≤ 0,08 ≤ 1,00 ≤ 1,00 ≤ 0,040 ≤0.03 ≤ 0,50 10.50-11.75
409L ≤0.03 ≤ 1,00 ≤ 1,00 ≤ 0,040 ≤0.03 ≤ 0,50 10.50-11.75
410/1.4006 ≤0.15 ≤ 1,00 ≤ 1,00 ≤ 0,040 ≤0.03 ≤ 0,50 12.00-14.00

 

Spezifikation

Tee with female threadead
Dimensions L L1 Z Z1 S
15 x 1/2x 15 82 34 19 19 26
18 x 1/2x 18 82 37 19 22 26
18 x 3/4x 18 82 39 19 23 30
22 x 1/2x 22 88 39 21 24 26
22 x 3/4x 22 88 40 21 24 30
28 x 1/2x 28 96 41 24 26 26
28 x 3/4x 28 96 43 24 27 30
28 x 1x 28 88 47 24 28 38
35 x 1/2x 35 110 44 27 29 26
35 x 3/4x 35 110 46 27 28 30
35 x 1 1/4″ x 35 110 54 27 33 47
42 x 1/2x 42 134 48 31 33 26
42 x 3/4x 42 134 50 31 34 30
42 x 1 1/2″ x 42 134 59 31 38 55
54 x 1/2x 54 154 54 36 39 26
54 x 3/4x 54 154 56 36 40 30
54 x 2x 54 154 70 36 44 70

 

Equal Tee
Dimensions L Z L1 Z1
15 82 19 36 14
18 82 19 39 17
22 88 21 42 19
28 96 24 46 22
35 110 27 53 25
42 134 31 66 30
54 154 36 77 36

 

Reducing Tee
Dimensions L Z L1 Z1
18 x 15 x 18 82 19 39 17
22 x 15 x 22 88 21 41 19
22 x 18 x 22 88 21 41 19
28 x 15 x 28 96 24 54 32
28 x 18 x 28 96 24 54 32
28 x 22 x 28 96 24 44 21
35 x 15 x 35 108 27 57 35
35 x 18 x 35 108 27 57 35
35 x 22 x 35 108 27 48 25
35 x 28 x 35 108 27 49 25
42 x 22 x 42 134 30 51 28
42 x 28 x 42 134 30 52 28
42 x 35 x 42 134 30 55 28
54 x 22 x 54 154 36 57 34
54 x 28 x 54 154 36 58 34
54 x 35 x 54 154 36 61 34
54 x 42 x 54 154 36 73 36

 

 

Anwendungen
School, residential area, hotel, shopping mall, pumping room, natural gas, solar energy, central air conditioning.

Feature

1. High corrosion resistance and strength

2. Reliable and durable

3. Long-life service

4. Safety and health to human

5. Eco-friendly

6. Extreme simplicity and quickness of installation

 

Engineering Case
Finanzzentrum Singapur,Liuzhou People’s HospitalCrowne Plaza Poly HotelShenzhen Songgang Middle SchoolBeijing Daxing Airport

 

Installation

Step 1: Pipes are preferably cut perpendicularly to length with a pipe cutter or fine-tooth saw or a special electrical pipe saw.

Step 2: The pipes are then to be carefully deburred inside and out and, if necessary, calibrated.

Step 3: The press fittings should be inspected visually for integrity prior to processing. In Ergänzung, the O-ring must be checked for correct fit and integrity. No other lubricants such as oils or greases may be used and only original IBP sealing elements are to be used.

Step 4: Before assembly, the insertion depth of the fitting must be marked on the pipe (for the dimensions, see the table later). Thus, any shifts can be detected before pressing.

Step 5: The pipe is inserted into the fitting as far as the pipe stop in accordance with the previously applied insertion mark.

Step 6: Insert the appropriate size of press jaw in the crimping tool and position the jaw at right-angles on the fitting at the pressing location. The press cycle is started by starting the pressing machine and is completed when the jaws are fully closed. Caution! Secure pressings can be achieved only when the pressing jaws have moved completely together.

Related Products

Unser Unternehmen

Foshan Kuanyu Edelstahl Co., GmbH, gegründet in 2011, ist ein modernes Unternehmen, Spezialisiert auf Produktion und Großhandel für alle Materialien von Edelstahlrohren für Trinkwasser,Edelstahl geschweißtes Rohr, Edelstahlrohrverschraubungen und so weiter. Unsere Produkte erfüllen den Standard von ASTM, IM, JIS, DIN etc., und weit verbreitet in der Ölraffinerieindustrie, petrochemisch, Elektrizität, Papierherstellung, Wein- und Automobilindustrie, mechanische Struktur, Konstruktion, elektronische biologische Technologie, Umwelttechnik und Küchenprodukte. Wir haben ISO9001 und ISO14001 bestanden.

Um die besten Produkte zu produzieren, Wir verwenden modernste Maschinenausrüstung, innovative Fertigungstechnologie, wettbewerbsfähigere Produktionslinie und auch mit dem Fachpersonal, reiche Erfahrung, „Kuanyu Edelstahlrohr“ zum Vorbild unserer Branche zu machen.

Unsere Werkstatt

Unser Geschäftspartner

Verpackung
Wooden case with water-proof bag or as your requirement for stainless steel press tee packing.

FAQ

Q.: What’s your MOQ(minimum order quantity)?
EIN: Usually our MOQ is 50 pcs, but we can accept less quantity for your trial order. Pls feel free to tell us how many piece you need.

Q.: Are you manufacturer or trader?
EIN: We are the manufacturer.Our register factory is located in the main stainless steel production base of China-Foshan City which is near Guangzhou/Shenzhen port.

Q.:How about your design ability? Do you offer OEM service?
EIN: we have our own design department, and have offer design service for thousands of cooperative partner. OEM accept and offer confidentiality agreementbusiness secret contractfor your design safe.

Q.: What’s your payment terms?
EIN: 30% im Voraus von T / T. ,70% erfolgt vor dem Versand oder gegen die BL-Kopie unter FOB / CIF / CFR.

Q.: How long is the production lead time time ?
EIN: It is 10-15 days generally and it can be negotiated based on your need and the quantity.

Senden Sie Ihre Nachricht an uns:

JETZT ANFRAGEN
JETZT ANFRAGEN