SUS316 Stainless Steel Press Male Fittings Tee For Pipeline Connection

簡単な説明:

1. Refusing water leakage
2. Economical and practial
3. Easy to install
4. Energy saving
5. Anti-rust
6. Healthy to human

製品の詳細

製品タグ

1. Refusing water leakage
2. Economical and practial
3. Easy to install
4. Energy saving
5. Anti-rust
6. Healthy to human

 

製品パラメータ

Product name  

SUS316 Stainless Steel Press Male Fittings Tee for Pipeline Connection

材料 TP304(SS304), TP316(SS316), TP316L(SS316L)
梱包 In wooden cases with water-proof package or as customers’ requirement for stainless steel tee packing
ドキュメント 1, 原材料認証
2, すべてのテスト & Inspection reports
3, 品質保証書
Min order 10 pieces
Productivity 20000 Pieces per month
Deliverytime 10days-25days
Payment terms T/T L/C
Service OEM , Free sample, Third Party Test for Stainless Steel Tee

 

CHEMICAL COMPOSITION(%)
MATERIAL C そして Mn P S Ni Cr others
304/1.4301 ≤0.08 ≤1.00 ≤2.00 ≤0.045 ≤0.03 8.00-10.50 18.00-20.00
304L/1.4306 ≤0.03 ≤1.00 ≤2.00 ≤0.045 ≤0.03 8.00-12.00 18.00-20.00
316/1.4401 ≤0.08 ≤1.00 ≤2.00 ≤0.045 ≤0.03 10.00-14.00 16.00-18.00
316L/1.4404 ≤0.03 ≤1.00 ≤2.00 ≤0.045 ≤0.03 10.00-14.00 16.00-18.00
201(≥1.0%Ni) ≤0.12 ≤1.00 8.5-10.0 ≤0.06 ≤0.03 ≥1.00 14.00-16.00
201(<1.0% Ni) ≤0.15 ≤1.00 8.5-10.0 ≤0.06 ≤0.03 <1.00 14.00-16.00
430/1.4016 ≤0.12 ≤1.00 ≤1.00 ≤0.040 ≤0.03 ≤0.75 16.00-18.00
409 ≤0.08 ≤1.00 ≤1.00 ≤0.040 ≤0.03 ≤0.50 10.50-11.75
409L ≤0.03 ≤1.00 ≤1.00 ≤0.040 ≤0.03 ≤0.50 10.50-11.75
410/1.4006 ≤0.15 ≤1.00 ≤1.00 ≤0.040 ≤0.03 ≤0.50 12.00-14.00

Specification

Tee with female threadead
Dimensions L L1 Z Z1 S
15 x 1/2x 15 82 34 19 19 26
18 x 1/2x 18 82 37 19 22 26
18 x 3/4x 18 82 39 19 23 30
22 x 1/2x 22 88 39 21 24 26
22 x 3/4x 22 88 40 21 24 30
28 x 1/2x 28 96 41 24 26 26
28 x 3/4x 28 96 43 24 27 30
28 x 1x 28 88 47 24 28 38
35 x 1/2x 35 110 44 27 29 26
35 x 3/4x 35 110 46 27 28 30
35 x 1 1/4″ x 35 110 54 27 33 47
42 x 1/2x 42 134 48 31 33 26
42 x 3/4x 42 134 50 31 34 30
42 x 1 1/2″ x 42 134 59 31 38 55
54 x 1/2x 54 154 54 36 39 26
54 x 3/4x 54 154 56 36 40 30
54 x 2x 54 154 70 36 44 70

 

Equal Tee
Dimensions L Z L1 Z1
15 82 19 36 14
18 82 19 39 17
22 88 21 42 19
28 96 24 46 22
35 110 27 53 25
42 134 31 66 30
54 154 36 77 36

 

Reducing Tee
Dimensions L Z L1 Z1
18 x 15 x 18 82 19 39 17
22 x 15 x 22 88 21 41 19
22 x 18 x 22 88 21 41 19
28 x 15 x 28 96 24 54 32
28 x 18 x 28 96 24 54 32
28 x 22 x 28 96 24 44 21
35 x 15 x 35 108 27 57 35
35 x 18 x 35 108 27 57 35
35 x 22 x 35 108 27 48 25
35 x 28 x 35 108 27 49 25
42 x 22 x 42 134 30 51 28
42 x 28 x 42 134 30 52 28
42 x 35 x 42 134 30 55 28
54 x 22 x 54 154 36 57 34
54 x 28 x 54 154 36 58 34
54 x 35 x 54 154 36 61 34
54 x 42 x 54 154 36 73 36

 

Applications
School, residential area, hotel, shopping mall, pumping room, natural gas, solar energy, central air conditioning.

Why Choose Us?

1. Approved by ISO9001, CE, SGS every year

2. Best service within 24 hour`s reply

3. Flexible payment with T/T,L/C and etc

4. Smooth production ability (50000 PCS/month)

 

What Can We Serve For You?

1. Sample can be offered with free.

2. We have full stock,and can deliver within short time.Many styles for your choices.

3. OEM and ODM order are accepted, Any kind of logo printing or design are available.

4. 良品質 + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.

5. All of our products are produce by our professional workman and we have our high-work-effect foreign trade team, you can totally believe our service.

 

Engineering Case
Singapore Financial CenterLiuzhou People’s HospitalCrowne Plaza Poly HotelShenzhen Songgang Middle SchoolBeijing Daxing Airport

Installation

Step 1: Pipes are preferably cut perpendicularly to length with a pipe cutter or fine-tooth saw or a special electrical pipe saw.

Step 2: The pipes are then to be carefully deburred inside and out and, if necessary, calibrated.

Step 3: The press fittings should be inspected visually for integrity prior to processing. In addition, the O-ring must be checked for correct fit and integrity. No other lubricants such as oils or greases may be used and only original IBP sealing elements are to be used.

Step 4: Before assembly, the insertion depth of the fitting must be marked on the pipe (for the dimensions, see the table later). Thus, any shifts can be detected before pressing.

Step 5: The pipe is inserted into the fitting as far as the pipe stop in accordance with the previously applied insertion mark.

Step 6: Insert the appropriate size of press jaw in the crimping tool and position the jaw at right-angles on the fitting at the pressing location. The press cycle is started by starting the pressing machine and is completed when the jaws are fully closed. Caution! Secure pressings can be achieved only when the pressing jaws have moved completely together.

Related Products

当社

佛山市寛域ステンレス鋼株式会社, 株式会社, 年に設立 2011, 現代の企業です, 飲料水用のステンレス鋼パイプのすべての材料の製造と卸売を専門としています,ステンレス鋼溶接パイプ, ステンレス鋼管継手等. 当社の製品はASTMの基準を満たしています, に, JIS, DINなど, 石油精製業界で広く使用されています, 石油化学, 電気, 製紙, ワインおよび自動車産業, 機械的構造, 建設, 電子生物学技術, 環境工学および厨房製品. ISO9001とISO14001に合格しました.

最高の製品を生産するために, 最先端の機械設備を使用しています, 革新的な製造技術, より競争力のある生産ラインと熟練したスタッフ, 豊富な経験, 「寛裕ステンレス鋼管」を業界のモデルにする.

私たちのワークショップ

私たちのビジネスパートナー

梱包
Wooden case with water-proof bag or as your requirement for stainless steel press tee packing.

よくある質問

Q: あなたのMOQは何ですか(最小注文数量)?
A: Usually our MOQ is 50 pcs, ただし、試用注文の数量は少なくて済みます. plsはあなたが必要なピースの数を教えてください.

Q: あなたは製造業者ですか、それともトレーダーですか?
A: 私たちはメーカーです。私たちの登録工場は、広州/深セン港に近い中国-佛山市の主要なステンレス鋼生産拠点にあります。.

Q:あなたのデザイン能力はどうですか? OEMサービスを提供していますか?
A: 独自の設計部門があります, 何千もの協力パートナーに設計サービスを提供しています. OEMは機密保持契約を受け入れて提供します “ビジネスシークレット契約” あなたのデザインを安全に.

Q: お支払い条件は何ですか?
A: 30% T / Tで事前に ,70% 出荷前、またはFOB / CIF / CFRに基づくBLコピーに対して行われます。.

Q: 生産リードタイムはどのくらいですか ?
A: です 10-15 一般的に日数とそれはあなたの必要性と量に基づいて交渉することができます.

私たちにあなたのメッセージを送ってください:

今すぐお問い合わせ
今すぐお問い合わせ