SUS304 Stainless Steel Press Female Fittings Tee Price

คำอธิบายสั้น:

1. High corrosion resistance and strength
2. Reliable and durable
3. Llong-life service
4. Safety and health to humaneco-friendly
5. Energy saving
6. Anti-leak
7. Easy to install

รายละเอียดผลิตภัณฑ์

แท็กสินค้า

1. High corrosion resistance and strength
2. Reliable and durable
3. Llong-life service
4. Safety and health to humaneco-friendly
5. Energy saving
6. Anti-leak
7. Easy to install

 

พารามิเตอร์ผลิตภัณฑ์

Products name SUS304 Stainless Steel Press Female Fittings Tee Price
Steel Grade: 300 series
Size: 15-108มิลลิเมตร
Type: Equal tee, reducing tee, female tee etc.
Max working pressure: 1.6MPa (equal to 232 psi)
Testing water pressure: 2.5MPa for JIS sizes (equal to 362.5psi), and 5MPa for EN10312 sizes.
Working temperature -20 ไปยัง 110 degree centigrade (with Chlorinated butyl rubber O ring),
Suit medium: Cold water, hot water, compressed air, gas, oil etc
Price Term: FOB, CIF, CFR or as your requirement
Payment: T / T 30% in advance, the balance before shipment
Delivery: About 15 days after receiving the deposit
การบรรจุ: Wooden case water-proof package or as your requirement for stainless steel tee packing

 

CHEMICAL COMPOSITION(%)
MATERIAL และ Mn S นิ Cr others
304/1.4301 ≤0.08 ≤1.00น ≤2.00น ≤0.045 ≤0.03 8.00-10.50 18.00-20.00
304L/1.4306 ≤0.03 ≤1.00น ≤2.00น ≤0.045 ≤0.03 8.00-12.00 18.00-20.00
316/1.4401 ≤0.08 ≤1.00น ≤2.00น ≤0.045 ≤0.03 10.00-14.00 16.00-18.00
316L/1.4404 ≤0.03 ≤1.00น ≤2.00น ≤0.045 ≤0.03 10.00-14.00 16.00-18.00
201(≥1.0%Ni) ≤0.12 ≤1.00น 8.5-10.0 ≤0.06 ≤0.03 ≥1.00 14.00-16.00
201(<1.0% นิ) ≤0.15 ≤1.00น 8.5-10.0 ≤0.06 ≤0.03 <1.00 14.00-16.00
430/1.4016 ≤0.12 ≤1.00น ≤1.00น ≤0.040 ≤0.03 ≤0.75 16.00-18.00
409 ≤0.08 ≤1.00น ≤1.00น ≤0.040 ≤0.03 ≤0.50 10.50-11.75
409L ≤0.03 ≤1.00น ≤1.00น ≤0.040 ≤0.03 ≤0.50 10.50-11.75
410/1.4006 ≤0.15 ≤1.00น ≤1.00น ≤0.040 ≤0.03 ≤0.50 12.00-14.00

 

Specification

Tee with female threadead
Dimensions L L1 Z Z1 S
15 x 1/2x 15 82 34 19 19 26
18 x 1/2x 18 82 37 19 22 26
18 x 3/4x 18 82 39 19 23 30
22 x 1/2x 22 88 39 21 24 26
22 x 3/4x 22 88 40 21 24 30
28 x 1/2x 28 96 41 24 26 26
28 x 3/4x 28 96 43 24 27 30
28 x 1x 28 88 47 24 28 38
35 x 1/2x 35 110 44 27 29 26
35 x 3/4x 35 110 46 27 28 30
35 x 1 1/4″ x 35 110 54 27 33 47
42 x 1/2x 42 134 48 31 33 26
42 x 3/4x 42 134 50 31 34 30
42 x 1 1/2″ x 42 134 59 31 38 55
54 x 1/2x 54 154 54 36 39 26
54 x 3/4x 54 154 56 36 40 30
54 x 2x 54 154 70 36 44 70

 

Equal Tee
Dimensions L Z L1 Z1
15 82 19 36 14
18 82 19 39 17
22 88 21 42 19
28 96 24 46 22
35 110 27 53 25
42 134 31 66 30
54 154 36 77 36

 

Reducing Tee
Dimensions L Z L1 Z1
18 x 15 x 18 82 19 39 17
22 x 15 x 22 88 21 41 19
22 x 18 x 22 88 21 41 19
28 x 15 x 28 96 24 54 32
28 x 18 x 28 96 24 54 32
28 x 22 x 28 96 24 44 21
35 x 15 x 35 108 27 57 35
35 x 18 x 35 108 27 57 35
35 x 22 x 35 108 27 48 25
35 x 28 x 35 108 27 49 25
42 x 22 x 42 134 30 51 28
42 x 28 x 42 134 30 52 28
42 x 35 x 42 134 30 55 28
54 x 22 x 54 154 36 57 34
54 x 28 x 54 154 36 58 34
54 x 35 x 54 154 36 61 34
54 x 42 x 54 154 36 73 36

การใช้งาน
School, residential area, hotel, shopping mall, pumping room, natural gas, solar energy, central air conditioning.

Why Choose Us?

1. Approved by ISO9001, CE, SGS every year

2. Best service within 24 hour`s reply

3. Flexible payment with T/T,L/C and etc

4. Smooth production ability (50000 PCS/month)

 

What Can We Serve For You?

1. Sample can be offered with free.

2. We have full stock,and can deliver within short time.Many styles for your choices.

3. OEM and ODM order are accepted, Any kind of logo printing or design are available.

4. อย่างดี + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.

5. All of our products are produce by our professional workman and we have our high-work-effect foreign trade team, you can totally believe our service.

 

Engineering Case
ศูนย์การเงินสิงคโปร์,Liuzhou People’s HospitalCrowne Plaza Poly HotelShenzhen Songgang Middle SchoolBeijing Daxing Airport

Installation

Step 1: Pipes are preferably cut perpendicularly to length with a pipe cutter or fine-tooth saw or a special electrical pipe saw.

Step 2: The pipes are then to be carefully deburred inside and out and, if necessary, calibrated.

Step 3: The press fittings should be inspected visually for integrity prior to processing. In addition, the O-ring must be checked for correct fit and integrity. No other lubricants such as oils or greases may be used and only original IBP sealing elements are to be used.

Step 4: Before assembly, the insertion depth of the fitting must be marked on the pipe (for the dimensions, see the table later). Thus, any shifts can be detected before pressing.

Step 5: The pipe is inserted into the fitting as far as the pipe stop in accordance with the previously applied insertion mark.

Step 6: Insert the appropriate size of press jaw in the crimping tool and position the jaw at right-angles on the fitting at the pressing location. The press cycle is started by starting the pressing machine and is completed when the jaws are fully closed. Caution! Secure pressings can be achieved only when the pressing jaws have moved completely together.

บริษัท ของเรา

บริษัท Foshan Kuanyu Stainless Steel Co., จำกัด, ก่อตั้งขึ้นในปีพ 2011, เป็นองค์กรที่ทันสมัย, เชี่ยวชาญในการผลิตและขายส่งสำหรับวัสดุทั้งหมดของท่อสแตนเลสสำหรับน้ำดื่ม,ท่อเชื่อมสแตนเลส, อุปกรณ์ท่อสแตนเลสและอื่น ๆ. ผลิตภัณฑ์ของเราเป็นไปตามมาตรฐาน ASTM, EN, ไอที, DIN ฯลฯ, และใช้กันอย่างแพร่หลายในอุตสาหกรรมโรงกลั่นน้ำมัน, ปิโตรเคมี, ไฟฟ้า, การทำกระดาษ, อุตสาหกรรมไวน์และรถยนต์, โครงสร้างทางกล, การก่อสร้าง, เทคโนโลยีชีวภาพอิเล็กทรอนิกส์, วิศวกรรมสิ่งแวดล้อมและผลิตภัณฑ์ในครัว. เราได้ผ่าน ISO9001 และ ISO14001.

เพื่อผลิตสินค้าที่ดีที่สุด, เราใช้อุปกรณ์เครื่องจักรที่ทันสมัยที่สุด, เทคโนโลยีการผลิตที่เป็นนวัตกรรมใหม่, สายการผลิตที่แข่งขันได้มากขึ้นและยังมีพนักงานที่มีทักษะ, ประสบการณ์อันยาวนาน, เพื่อให้“ ท่อเหล็กสแตนเลสกวนยู” กลายเป็นต้นแบบของอุตสาหกรรมของเรา.

การประชุมเชิงปฏิบัติการของเรา

พันธมิตรทางธุรกิจของเรา

การบรรจุ
Wooden case with water-proof bag or as your requirement for stainless steel press tee packing.

คำถามที่พบบ่อย

ถาม: MOQ ของคุณคืออะไร(ปริมาณการสั่งซื้อขั้นต่ำ)?
ก: Usually our MOQ is 50 pcs, แต่เราสามารถยอมรับปริมาณที่น้อยลงสำหรับคำสั่งทดลองของคุณ. กรุณาอย่าลังเลที่จะบอกเราว่าคุณต้องการกี่ชิ้น.

ถาม: Are you manufacturer or trader?
ก: We are the manufacturer.Our register factory is located in the main stainless steel production base of China-Foshan City which is near Guangzhou/Shenzhen port.

ถาม:How about your design ability? Do you offer OEM service?
ก: we have our own design department, and have offer design service for thousands of cooperative partner. OEM accept and offer confidentiality agreementbusiness secret contractfor your design safe.

ถาม: เงื่อนไขการชำระเงินของคุณคืออะไร?
ก: 30% ล่วงหน้าโดย T / T ,70% ก่อนจัดส่งหรือเทียบกับสำเนา BL ภายใต้ FOB / CIF / CFR.

ถาม: How long is the production lead time time ?
ก: It is 10-15 days generally and it can be negotiated based on your need and the quantity.

ส่งข้อความของคุณถึงเรา:

สอบถามข้อมูลในตอน
สอบถามข้อมูลในตอน